U.S. Renewable Energy Law in 2026: What Turkish Manufacturers and EPC Contractors Need to Know

by Hasan Alaz, Esq., Founding Attorney

U.S. Renewable Energy Law in 2026: What Turkish Manufacturers and EPC Contractors Need to Know

Short answer: A Turkish company entering the U.S. energy market in 2026 has to manage four things at once: federal tax credits with new deadlines and China-related ownership and sourcing rules, tariffs on imported equipment and metals, a small set of contracts that allocate most of the project risk, and a visa plan for the people who must be on site. Türkiye is not a "foreign entity of concern," so Turkish ownership by itself does not block U.S. clean energy credits, but the supply chain behind the product still has to be checked. This guide is written for Turkish solar, transformer and electrical equipment manufacturers, EPC and construction contractors, and investors considering U.S. energy projects. It walks through how a U.S. project is put together, which 2026 rules matter most, which contracts carry the risk, which incentives may be available, and how to move your team to the U.S. The right plan for your company depends on narrower facts, including:

  • whether you are manufacturing equipment in the U.S., building projects, or investing in them;
  • where your inputs come from, especially any Chinese-origin components, licenses or ownership;
  • who your U.S. buyers are and what their contracts and lenders require;
  • which managers and engineers need to be in the U.S., and when;
  • which state the plant or project is in, and what state and local incentives apply. For how we approach these projects, see our Energy Law & Investments page.

  1. Quick Reference Table: What Matters in 2026

IssueWhat changed or matters in 2026Who it affects most
Wind and solar tax credits (45Y / 48E)Construction had to begin by July 4, 2026, or the project must be placed in service by December 31, 2027Developers, investors, EPC contractors
FEOC / material assistance rulesProjects beginning construction after December 31, 2025 can lose credits for prohibited foreign ownership or sourcing; IRS interim safe harbors issued February 12, 2026Manufacturers and their buyers
Manufacturing credit (45X)Available for qualifying U.S.-made clean energy components, with FEOC limits and a phase-out scheduleSolar, battery and component manufacturers
Selling credits (Section 6418)Owners can sell credits for cash to unrelated U.S. taxpayersDevelopers and corporate buyers
IEEPA tariffsEnded after the Supreme Court's February 20, 2026 decisionImporters
Section 232 dutiesStill apply to steel, aluminum and copper and many derivative productsTransformer, structure and cable makers
Solar import pricesMinimum import prices on polysilicon, wafers, cells and modules start December 4, 2026Solar importers and U.S. module makers
Grid equipmentApril 20, 2026 Defense Production Act proclamation names transformers, transmission lines and substations as defense prioritiesTransformer and electrical equipment makers
Bulk-power equipment securityAugust 26, 2026 executive order lets DOE restrict equipment linked to embargoed or sanctioned countries; rules due December 24, 2026Grid equipment suppliers and utilities

  1. Why the U.S. Energy Market Matters for Turkish Companies Now

Federal policy in 2026 has shifted in two directions at once. Support for new wind and solar generation has narrowed, with earlier credit deadlines, stricter permitting review and new restrictions on Chinese involvement. At the same time, the federal government has made the electric grid and domestic manufacturing a national security priority, and grid equipment such as transformers, conductors and breakers is now named in Defense Production Act actions. For Turkish manufacturers, that creates an opening. U.S. buyers increasingly need suppliers whose products and inputs are not tied to China, and producing in the U.S. can reduce tariff exposure and support U.S. tax credits for both the manufacturer and its customers. For Turkish EPC contractors, the opportunity is in experienced execution, but U.S. contracts, labor rules and financing requirements are different from what many contractors are used to at home.


  1. How a U.S. Renewable Energy Project Comes Together

Most utility-scale projects move through five stages, and each brings its own contracts and its own legal questions.

Development

The developer secures land, usually through lease options that give an exclusive right to lease a parcel later without committing now, followed by long-term leases or easements. Wind projects often start with meteorological tower agreements to measure the wind resource. At the same time, the developer runs environmental and title diligence, applies for permits and files an interconnection request with the grid operator.

Interconnection

Connecting to the grid is often the longest step. Outside most of Texas, interconnection is governed by FERC rules. FERC Order No. 2023, issued in July 2023, moved grid operators from first-come, first-served queues to cluster studies with stricter deadlines and readiness requirements, to reduce long queue backlogs. In most of Texas, the grid is run by ERCOT and regulated by the Public Utility Commission of Texas, with its own interconnection process.

Offtake

The developer signs a power purchase agreement (PPA), a virtual PPA or a hedge that fixes who buys the power and at what price. Lenders and tax investors usually want this in place before they commit.

Financing

The project raises money from sponsor equity, tax equity or the sale of tax credits, and project debt. This stage is discussed in section 5.

Construction and operations

The EPC contractor builds the project with equipment bought under supply agreements. After commercial operation, an O&M contractor runs the plant and the owner claims the credits. Construction is where most Turkish manufacturers and contractors enter a project, and where their people need to be on site.


  1. Tax Credits After the One Big Beautiful Bill Act

ITC and PTC: the two main credits

Since 2025, most clean electricity projects claim one of two technology-neutral credits: the investment tax credit (Section 48E), based on the cost of the project, or the production tax credit (Section 45Y), based on the electricity it produces over ten years. The base credit is multiplied by five for projects that meet prevailing wage and apprenticeship requirements. Additional "bonus" amounts may be available for meeting domestic content requirements, which look at U.S.-made steel, iron and manufactured components, and for projects in designated energy communities.

Wind and solar deadlines

The 2025 One Big Beautiful Bill Act accelerated the end of these credits for wind and solar. To qualify, a project had to begin construction by July 4, 2026, or be placed in service by December 31, 2027. Projects relying on the earlier start date need a clear record of when construction began. Since 2013, the IRS has recognized two ways to show that construction began: starting "physical work of a significant nature" (the Physical Work Test), or paying or incurring at least 5% of the project's total cost (the Five Percent Safe Harbor). Both require continuous progress afterward. IRS guidance had limited wind and most solar projects to the Physical Work Test. A federal district court later vacated that guidance, finding that Treasury did not give a reasoned basis for the change. Anyone relying on either test should check the current status, including any appeal, before closing a deal.

Battery storage

Since the Inflation Reduction Act, standalone energy storage has been eligible for the investment credit, so batteries no longer need to sit at a solar or wind project. Storage did not lose its credit on the wind and solar timeline, but the FEOC rules apply.

Prevailing wage and apprenticeship

To earn the full five-times credit, workers on the project must be paid local prevailing wages, and a required share of labor hours (15% for projects beginning construction after 2023) must be performed by qualified apprentices. Owners usually push these obligations down to the EPC contractor and every subcontractor. Contractors should expect payroll recordkeeping requirements, audit rights and indemnities for any lost credit. A U.S. investment credit can also be recaptured if wage requirements are not met during the first five years.

FEOC and material assistance rules

The new "foreign entity of concern" and "prohibited foreign entity" rules look at two things: who owns or controls the project or manufacturer, and where the components come from. For projects beginning construction after December 31, 2025, too much "material assistance" from prohibited foreign entities, notably Chinese-linked companies, can eliminate the credit. The IRS released interim safe harbors for calculating the material assistance cost ratio on February 12, 2026, and final rules are still expected. In practice, U.S. buyers will ask suppliers to certify where their inputs come from and to keep records that support those certifications. A Turkish supplier with a clean, documented supply chain can be more valuable to a U.S. buyer than a cheaper supplier who cannot provide that support.

The manufacturing credit (45X)

Section 45X rewards companies that produce qualifying clean energy components in the U.S. and sell them to unrelated buyers. It is claimed per unit produced and sold. It can be sold to another taxpayer and, in some cases, paid directly by the IRS. It is subject to FEOC limits and a phase-out schedule, so the timing of a new U.S. plant matters.


  1. Financing: Turning Tax Credits Into Cash

Most developers do not have enough U.S. tax liability to use their own credits, so they raise money in one of three ways.

Tax equity

A bank or other investor joins the project company and takes most of the tax benefits in exchange for its investment. The most common structure is a partnership flip, where the investor takes most of the benefits until it reaches an agreed return, and then the split "flips" in favor of the sponsor. Other structures include the sale-leaseback, used for investment credit projects and closed within three months after the project is placed in service, and the inverted lease.

Credit transfers

Since 2023, owners can sell credits once, for cash, to an unrelated U.S. taxpayer under a tax credit transfer agreement (TCTA). The buyer bears the risk that the credit is disallowed or recaptured, and can also face a 20% penalty on an excessive credit claim. So buyers run diligence, negotiate seller indemnities, often backed by a parent guarantee, and frequently require tax credit insurance. Production credits usually sell at a smaller discount than investment credits because they carry no recapture risk. Lenders also offer bridge loans that advance cash before the credit sale closes and are repaid from the sale.

Project debt

Project lenders look mainly to the project's contracts and cash flow, not to the sponsor's balance sheet. They test ratios such as the debt service coverage ratio (cash flow divided by debt payments) and require real sponsor equity, a security package over the project's assets and contracts, and strong insurance.

Why this matters to suppliers and contractors

Lenders and tax investors read your contract too. Weak warranties, unclear delivery dates, missing sourcing certifications or unlimited change-order rights can delay a financing, and the developer will push those concerns back to you in negotiation.


  1. The Contracts That Carry the Risk

Power purchase agreements

In a physical PPA, the generator sells and delivers electricity to the buyer at a fixed price, often with an annual escalator, typically for 10 to 20 years. In a virtual (financial) PPA, no power is delivered: the parties settle the difference between a fixed price and the market price. Most PPAs with commercial and industrial buyers are virtual. A sleeved PPA combines elements of both through a licensed retail supplier. Key terms include price, term, delivery point, curtailment, credit support, and who keeps the environmental attributes such as renewable energy certificates. Without a long-term PPA, projects often sell at market prices and use hedges. A fixed-volume hedge leaves the project exposed if it produces less than expected, and any hedge settled at a trading hub creates basis risk if the price at the project's location differs from the hub price.

EPC contracts

Most utility-scale projects use a lump-sum turnkey EPC contract, where one contractor designs, procures and builds the project for a fixed price and date. The points we see negotiated most are:

  • Liability caps: often 30% to 50% of the contract price, sometimes higher in project finance deals, with gross negligence and willful misconduct usually excluded from the cap.
  • Liquidated damages: pre-agreed payments for delay and for performance shortfalls, each with its own sub-cap and an overall cap.
  • Force majeure: which events excuse delay, whether the contractor gets more time, more money, or both, and how long before either party can terminate.
  • Change orders and extensions of time: how scope changes, owner delays and unforeseen site conditions are priced and scheduled.
  • Change in law and tariffs: who bears new duties, import restrictions or sourcing rules introduced after signing. In 2026, this clause deserves close attention.
  • Wage and sourcing flow-downs: prevailing wage, apprenticeship, domestic content and FEOC obligations passed down from the owner.

Equipment supply agreements

For manufacturers, the supply agreement is often the most important contract. Key points include the delivery schedule and delay damages, warranties and defect remedies, testing and acceptance, title and risk transfer, tariff and change-in-law pass-through, and the certifications the buyer needs for its tax credits.

O&M agreements

After completion, an operation and maintenance agreement covers routine and corrective maintenance. Fees may be fixed or cost-plus, and owners often seek availability guarantees.

Foreign law and arbitration

Contracts drafted under Turkish or other foreign law, or with a foreign arbitration seat, should be reviewed for points where U.S. law, lender requirements or tax rules may override what the parties expected.


  1. Tariffs, Trade and Grid Security in 2026

What ended

On February 20, 2026, the Supreme Court held that the International Emergency Economic Powers Act (IEEPA) does not authorize tariffs, and the IEEPA tariffs were ended.

What still applies

  • Section 232 duties on steel, aluminum and copper, which reach many derivative products and industrial equipment. These matter for transformers, steel structures and cables, and the rules were adjusted again in June 2026.
  • Minimum import prices on solar polysilicon, ingots and wafers, cells and modules, effective December 4, 2026.
  • An October 22, 2026 Section 232 finding on wind turbines and components, which directs negotiations with trading partners rather than imposing a new tariff for now.

Grid equipment

The April 20, 2026 Defense Production Act proclamation on grid infrastructure covers transformers, transmission lines, conductors, substations and high-voltage circuit breakers, and lets the Department of Energy support domestic capacity through purchases, purchase commitments and financial support. A separate August 26, 2026 executive order allows the Secretary of Energy to restrict the import and installation of bulk-power-system equipment, including transmission at 69 kV and above, linked to "covered foreign entities." These are countries subject to a U.S. arms embargo or sanctions, and companies they own or control. The Secretary may also set conditions on equipment already installed. Implementing rules are due by December 24, 2026. For a Turkish transformer or electrical equipment maker, this combination is generally favorable, but product-by-product tariff and origin checks are still needed.


  1. Incentives for Manufacturers Building in the U.S.

  • Federal manufacturing credit (45X): for qualifying clean energy components, as described in section 4.
  • Department of Energy grid supply chain programs: DOE has funded grid equipment manufacturing through its Grid Supply Chain program. Concept papers for the current Grid SCALED round closed on November 20, 2026, full applications are due February 8, 2027, and DOE has said more funding calls are expected in 2027.
  • Texas JETI: the Texas Jobs, Energy, Technology and Innovation Act (Government Code Chapter 403, Subchapter T) can reduce school district maintenance and operations property taxes for up to ten years for qualifying projects that meet investment and job requirements. Applications go through the school district and the Texas Governor's Office. Incentive applications often have to be filed before construction starts or before a site is committed, so incentive planning should happen at the same time as site selection, not after. We work with tax advisors and economic development consultants on these applications.

  1. Setting Up the U.S. Company

Before the first contract is signed or the first visa petition is filed, the U.S. company should exist and be properly structured. Common steps include:

  • choosing between an LLC and a corporation, considering U.S. and Turkish tax treatment;
  • forming the company, and registering it in Texas if it was formed elsewhere (see Delaware LLC Doing Business in Texas);
  • preparing an operating agreement or bylaws and, for joint ventures, a shareholder or joint venture agreement (see Operating Agreement for a Foreign-Owned LLC);
  • obtaining an EIN, opening bank accounts and meeting foreign-ownership reporting such as Form 5472 where it applies (see Form 5472 for a Foreign-Owned Single-Member LLC);
  • documenting the investment and source of funds in a way that also supports the visa petitions.

  1. Visas for the People Who Build the Project

A factory or project cannot start without the managers and engineers who know the product. Common options for Turkish companies include:

E-2 treaty investor

Türkiye is an E-2 treaty country. A U.S. company at least 50% owned by Turkish nationals can support E-2 status for the Turkish investor and for Turkish employees in executive, supervisory or essential-skills roles. There is no fixed minimum investment, but the investment must be substantial and committed to a real operating business. See E-2 visa and E-2 Visa Employee Requirements in 2026.

L-1A and L-1B intracompany transfers

The L-1 lets a Turkish parent transfer managers and executives (L-1A) or specialized-knowledge staff (L-1B) to a related U.S. company. The employee must have worked for the related company abroad for at least one continuous year in the last three years. A "new office" L-1A is usually approved for one year at first, so the U.S. business plan has to show how the operation will grow. See L-1A vs. E-2 in 2026.

H-1B and TN

The H-1B covers engineers and other specialty-occupation roles but, for most employers, is subject to an annual cap and lottery. The TN is available only to qualifying Canadian and Mexican professionals, which can help when the team includes engineers from those countries.

Green cards

Once the U.S. operation is running, the EB-1C multinational manager category, which does not require labor certification, and other employment-based categories can give key staff permanent residence.

Sequencing

Timing should be planned backward from the commercial start date. The entity, ownership documents and investment records usually need to exist before the visa petitions are filed, and consular appointment times vary.


  1. A Practical Market-Entry Checklist

  1. Define what you will make, build or invest in, and where.
  2. Map your supply chain for FEOC, origin and tariff exposure.
  3. Identify target buyers and the certifications their contracts and lenders will require.
  4. Screen federal, state and local incentives before committing to a site.
  5. Form and structure the U.S. company and document the investment.
  6. Review EPC, supply and joint venture agreements before signing.
  7. File visa petitions for the people needed in the first 12 months.
  8. Set up prevailing wage, sourcing and recordkeeping compliance from day one.

  1. Example: Elin Energy

For Elin Energy, a Turkish solar panel manufacturer's $50 million U.S. investment, our immigration strategy relocated 20 key personnel to its Texas plant. The entity, investment documentation and visa petitions were coordinated so the team could arrive as the plant started up. See the Elin Energy case study. Past results do not guarantee a similar outcome.


  1. Risks and Limitations

  • Tax credit rules are still being written, and court decisions can change how deadlines are applied.
  • Tariffs and import rules can change with little notice, which is why change-in-law and tariff clauses matter.
  • FEOC rules can affect a buyer's credits even when the supplier itself is not Chinese-owned.
  • Incentive programs have application windows and conditions that can be missed if planning starts late.
  • Visa timing depends on the category and the consulate, and cannot be guaranteed.

  1. When Speaking With an Attorney May Make Sense

  • before signing an EPC, supply or joint venture agreement with a U.S. counterparty;
  • before choosing a U.S. site or applying for state or local incentives;
  • when a buyer asks for FEOC, origin, domestic content or prevailing wage certifications;
  • before the management team needs to be in the U.S. Our corporate and immigration work is coordinated as one project, in English and Turkish, and we work alongside tax and regulatory advisors where needed.

  1. Official Sources


  1. FAQs

Can a Turkish-owned company claim U.S. clean energy tax credits?

Often, yes. Türkiye is not a foreign entity of concern. Eligibility still depends on the type of project, when construction began, prevailing wage compliance, and any Chinese-linked ownership or inputs.

Is it too late for new wind and solar projects to get credits?

Projects that did not begin construction by July 4, 2026 must be placed in service by December 31, 2027. Storage and manufacturing credits follow different timelines.

Do tariffs apply to equipment imported from Türkiye?

Some do. Section 232 duties on steel, aluminum and copper can apply depending on the product, so each product line should be checked.

Does a Turkish supplier have to comply with U.S. prevailing wage rules?

If you perform construction work on a U.S. project that claims the full credit, the owner will usually require you and your subcontractors to pay prevailing wages and keep payroll records. Off-site manufacturing is treated differently, so the contract scope matters.

Which visa fits a Turkish factory investment?

Usually the E-2 for investors and key staff of a Turkish-owned company, or the L-1 for managers transferring from the Turkish parent, with H-1B for engineers.

Do I need a U.S. company before applying for visas?

In most cases, yes. The entity, ownership structure and investment documents are typically prepared first, because the petition must describe a real operating business.

Can you review an EPC contract governed by foreign law?

Yes, including contracts with non-U.S. governing law or arbitration seats, with attention to where U.S. law, lender or tax requirements may change the expected result.


Planning a U.S. energy investment? Tell us about the asset, the timeline and the people who need to be on site, and we will outline the first steps. Contact us or call +1 (469) 949-4646. Attorney Hasan Alaz is licensed to practice law in Texas and Missouri, and as an attorney in Türkiye. Alaz Law Firm PLLC practices corporate law, immigration and nationality law, and estate planning, and associates local counsel where needed. Informational notice: This article provides general information only, current as of November 27, 2026. It is not legal or tax advice, does not create an attorney-client relationship, and does not substitute for advice on your specific facts. Past results do not guarantee similar outcomes. Responsible attorney: Hasan Alaz, Esq.

Informational notice

This page provides general information only. It is not legal advice, does not create an attorney-client relationship, and is not a substitute for advice based on your specific facts.

More articles

E-2 Visa Business Plan Requirements in 2026: What Officers Look For and What a Strong Plan Should Include

A strong E-2 business plan in 2026 should explain the business model, committed investment, hiring path, financial assumptions, investor role, and why the enterprise is not marginal.

Read more

AC21 Job Portability: The 180-Day I-485 Rule

When can an employment-based green card applicant change jobs? Learn AC21’s 180-day I-485 rule, the same-or-similar test, Supplement J, and withdrawal risks.

Read more

Ready to start your case?

Tell us about your situation and our team will review your case and follow up with the strongest next step.

Our office

  • Alaz Law
    825 Watters Creek Blvd., Building M, Suite 250,
    Allen, TX 75013

Immigration Law Services

Review general information and legal service options for U.S. immigration matters.

Attorney Hasan Alaz is licensed to practice law in the State of Missouri and the State of Texas. The firm provides legal services in corporate law, immigration and nationality law, and estate planning, which permits representation of clients before federal agencies and courts throughout the United States and abroad.